Seatown Review Just signed?

Timeline · Seatown heat pump install

Day-by-day timeline

Entries come from our contract documents, emails, photos and Seattle’s public permit records, plus our own recollection where noted. Times are Pacific.

  1. Furnace tune-up

    A Seatown technician performed a tune-up on our roughly 9-year-old American Standard gas furnace. As we recall it, the tech said there was “play in the motor” and the furnace could fail at any time.

    A basement sewing studio with a work table and lamp under exposed ceiling joists
    The basement studio a month before the tune-up, August 2026
  2. Sale and financing, same day

    We signed for a full heat pump system with new ductwork. The loan was e-signed around 5:05 PM through Service Finance Company, a Truist subsidiary.

    • Amount financed: $25,225.26. Disclosed APR: 23.99%.
    • 12 months with no interest and no payments, then 84 × $622.29. Total of payments: $52,272.36.
    • The loan’s Notice of Right of Rescission gave us until midnight Sept 25 to cancel.
    • The salesperson quoted about $3,500 in PSE and Seattle City Light incentives.

    We were not given a separate Notice of Cancellation form, were not told orally about a right to cancel, and did not sign any emergency waiver. A copy of the signed contract never arrived in our email. After we asked for it, it took Seatown six days to send it.

    Photo of a screen showing a Mitsubishi outdoor heat pump, black air handler and thermostat, with model details blurred and a line reading up to 50 ft of line set included
    The equipment on our estimate: a Mitsubishi ducted air handler and heat pump, with up to 50 ft of line set included
  3. Furnace removed; install begins

    A crew removed our gas furnace and began the install. This was inside the cancellation period stated on our loan paperwork. We had no heat from this point.

    The salesperson who sold us the job was not on site to walk the crew through the plan or confirm it with us. The install crew later told us that on larger jobs, the salesperson usually walks them through the plan.

    A white-walled basement room with a single silver metal duct running along the ceiling beside the electrical panel
    The basement before, with the original metal duct run (2025)
  4. We stop work over the duct layout

    Long runs of flexible duct were being installed through the basement studio we use every day. It was not what we understood from the sale, and we stopped work. Per city records, the electrical permit for the heat pump circuit wasn’t issued until after work had started.

    Bulky black flexible duct strung along the basement ceiling joists above a work table
    Flexible duct strung through our studio, Sept 24, 11:52 AM
  5. $3,361.16, then $1,600, then $800, then $0

    Seatown first gave us an estimate of $3,361.16 to replace the flexible duct it had just installed: $2,400 for rigid duct, $2,240.40 to insulate it, less a $1,600 discount that applied only “if sold on site,” plus tax.

    We said no. By phone, Seatown then asked for $1,600 to insulate the new rigid duct, saying code required it because a register it had added made the basement conditioned space. Conditioned space doesn’t require duct insulation, and when we said so the figure became $800, because “we gotta pay our guys.” We said no again and pointed at the $25,000 we had already borrowed. Only then did Seatown issue a revised estimate for $0, which the salesperson texted was “what I have been pushing the entire time.” The $0 revision covered the rigid duct only, not the line set. The $1,600 and $800 figures were by phone; the two written estimates are below.

    First estimate line items: rigid duct run $2,400, R8 insulation $2,240.40, onsite discount minus $1,600, total $3,361.16First: $3,361.16
    Revised estimate: rigid duct run $2,400 offset by a $2,400 price reduction, total $0.00, marked AcceptedRevised: $0
    Both Sept 25 estimates for the same duct fix. Address cropped, names removed.
  6. Heat restored, with no mechanical or refrigeration permit

    The system was turned on around 3 PM, about three days after the furnace came out. No air filter was installed. We filed complaints with Washington L&I and the Better Business Bureau.

    Seattle’s permit records show the mechanical and refrigeration permits were applied for and issued only after the system was already running.

    The flex duct across the basement the morning heat came back, Sept 26, 11:15 AM
  7. Fiberglass smell and debris from the vents

    With the system running, we noticed a fiberglass smell from the new flexible duct. A technician later told us new flex duct can off-gas like that. Debris from ducts that hadn’t been cleaned was blown out of the registers into our house.

    A white floor register grille with dirt and debris caught in and around its openings
    Debris at a supply register, Sept 27
  8. A no-show, a hostile call, and $2,500 off

    A crew Seatown had confirmed did not come. The duct repair was still unscheduled.

    We sent Seatown a written list of concerns. In our experience the sales managers had been hostile on the phone, and we wanted everything in writing. That evening, on a call, a manager told my wife she was being unreasonable multiple times, then told me I had a point regarding the same grievances. Afterward we received a revised contract that took $2,500 off before tax. It was still dated Sept 22.

  9. Rigid duct installed

    We bought and installed an air filter ourselves that morning. In the afternoon a two-person crew replaced the flexible duct with rigid duct. The line set was not moved.

    Silver rigid metal duct running along the basement ceiling above the carved mantel, with a white-wrapped refrigerant line set strung along the joists above it
    Rigid duct in the studio after the rework, Sept 29. The white line set still runs along the joists.
  10. We sign the revised financing

    Revised amount financed: $22,461.51, a reduction of $2,763.75 with tax (about 11%). The quoted incentives were written into the signed contract. The line set was not rerouted as we had requested.

    The new air handler next to the water heater, with white-wrapped refrigerant lines running up from it and along the ceiling beside the new rigid duct
    The line set as it was left, running from the new air handler across the basement ceiling
  11. City inspection: one of three permits passes

    Two city inspectors checked the job’s three permits. The mechanical permit passed. The refrigeration and electrical permits failed and needed corrections.

    • Refrigeration: the secondary condensate drain wasn’t used, there was a gap in the line-set insulation, and the added-refrigerant sticker on the outdoor unit wasn’t filled out.
    • Electrical: the line-voltage cable was supported by the refrigerant line set instead of being fastened to the structure, the cable where it attaches to the indoor unit was left unprotected in open space, and the outdoor box was bonded with a ground wire too small for its 25-amp breaker.

    The city gave 14 days to complete the electrical corrections and allowed them to be approved by photo.

  12. Corrections made; waiting on the city

    Seatown scheduled the corrections. The crew arrived just after 1:30 PM because their truck had broken down that morning. They made the refrigeration and electrical corrections and took photos. Seatown told us it would send the photos to the city; as we understand it, that’s in place of a return inspection.

    We haven’t told the lender the job is complete, and won’t until the city signs off.

  13. We tell the lender the job isn’t done

    We called Service Finance and told them the job wasn’t complete: two of the three permits still hadn’t passed inspection. We did not confirm completion to anyone.

  14. The lender pays Seatown anyway

    Our first billing statement shows Service Finance paid out the full $22,461.51 loan on this day, and our 12-month no-payment period started with it. Service Finance later told us Seatown had reported the job complete. Refrigeration and electrical hadn’t passed inspection, and wouldn’t for almost two more weeks. We didn’t learn about this until November.

  15. Reinspection fails again, on one item

    The city’s refrigeration inspector came back to re-check the corrections. It failed again, on a single item: the added-refrigerant sticker on the outdoor unit is still blank. No amount, no date of first charge. This was one of the three refrigeration items flagged at the first inspection. It’s a one-minute job on a unit that sits outside the house, so nobody needs to be home for it. We emailed Seatown’s customer-service and permit addresses the same morning asking them to fill it in.

    Electrical is still unresolved. It’s been more than a week since the rework, and we’ve had no word on whether the city accepted the photos. We asked Seatown whether we need to schedule an inspector or whether photos are still the plan.

    We still hadn’t told the lender the job was complete, and at the time we believed the lender wouldn’t pay Seatown until it passed inspection. Correction: we later learned Service Finance had already paid Seatown on Oct 16.

    Refrigerant amount label on the outdoor heat pump unit, with the factory charge, additional charge, total charge and date of first charge lines all left blank
    The refrigerant sticker on the outdoor unit, still blank at the reinspection
  16. Electrical: one more correction

    The city’s electrical inspector reviewed Seatown’s photos and asked for one more fix: the outdoor boxes needed to be bonded with a correctly sized equipment grounding conductor. Everything else, he wrote, was “perfect.” Seatown scheduled its crew for the correction, then asked us for a date for the final inspection.

  17. We book the final inspections ourselves

    Both remaining items were on the outdoor unit, so nobody needed to be home. We wrote back the next morning asking Seatown to book the earliest available inspections and confirm the times. We hadn’t heard back by that evening, so we scheduled the refrigeration and electrical inspections ourselves, sent Seatown the dates and met the inspectors.

  18. All three permits pass

    The refrigeration and electrical permits both passed. All three permits for the job are now marked complete in Seattle’s records. The same day, we emailed Seatown’s permit and customer-service addresses asking them to confirm the job is complete, nothing is outstanding and the agreement is fulfilled.

  19. We find out the loan was paid in October

    Seatown still hadn’t answered our request to confirm the job is complete. We signed up for the lender’s online portal and found the loan had been paid out on Oct 16.

    We called Service Finance. They said Seatown had reported the job complete and submitted it on Oct 16, that the document was with their back office, and that we should get it from Seatown. The same day we emailed Seatown’s general manager, sales rep and manager asking for a copy, who signed or submitted it and how, by Nov 9.

  20. Nobody will show us the document

    Seatown didn’t answer by the deadline. We called Service Finance again, and they told us they couldn’t give us the document. We called Seatown, which said its admin team would email it to us by the next day. We’ll post what it says when we get it.

The cancellation rule for home-secured credit is in federal Regulation Z, 12 CFR 1026.23(c).